Does the I-66 Corridor run along U.S. 60 through Sikeston?

No. Every planning document since 1989 places the corridor’s Mississippi River crossing at Cape Girardeau, and federal law routes it from Paducah into Illinois, then into Missouri.

1989 Pre-Work Proposal: Dr. Lonnie Haefner’s I-66 proposal described a crossing of the Mississippi River “in the vicinity of or south of Cape Girardeau, across the southern tip of Illinois to existing I-24 northward of Paducah, Kentucky.” Scott City sits just south of Cape Girardeau. Walt Wildman, then executive director of I-66 Project, Inc., lobbied hard for the route to pass near the town.

January 1995 – Missouri’s Highway Commission: The Missouri Highway and Transportation Commission unanimously supported corridor language running “through Kentucky to Illinois, and into Missouri.” It called replacing the Cape Girardeau bridge “a key element in being able to secure such a corridor through Missouri.”

1991-1995 Federal Law: Congress identified the corridor in general terms in 1991, in ISTEA. The specific route was written into law in 1995 by the National Highway System Designation Act: “…Hopkinsville, Benton, and Paducah, into Illinois, and into Missouri.” The statute brings the corridor into Missouri from Illinois, not along U.S. 60 from Sikeston. West of Cape Girardeau, U.S. 60 does play a part: following the 1989 concept through Springfield, the corridor’s route runs to Van Buren, then along U.S. 60 to Springfield and on toward Wichita, Kansas.

2005 Kentucky’s Study: KYTC’s I-66 Corridor Study (Western Kentucky to Missouri) looked at alternatives inside Kentucky that would have needed a new river crossing near where the Ohio meets the Mississippi. It found that the Illinois alternative “would satisfy the Congressional designation of a route.” This was Alternative 20, a corridor from I-24 north of Paducah in Massac County, Illinois, to I-55 at Cape Girardeau, needing no new river crossing.

2014 Kentucky’s Transportation Secretary: On November 5, 2014, Secretary Michael Hancock and his staff met with IDOT and its study team at the Cabinet’s headquarters in Frankfort, and restated the Cabinet’s position that no alternatives within Kentucky should be considered. Their reasons:

  • The congressional designation routes the corridor from Paducah into Illinois
  • A new Mississippi River crossing would face navigational restrictions
  • Funding for such a project in Kentucky had not been identified and was not anticipated
  • The Kentucky General Assembly had not authorized the Cabinet to take part in the study

The meeting summary quotes Secretary Hancock calling an alternative in Kentucky “an unfeasible mega project they do not have the ability to fund nor the intentions to pursue.” He also noted that “the Kentucky General Assembly has not authorized KYTC staff to participate in the 66 Corridor Study.” A month later, on December 3, 2014, IDOT and its study team met by webinar to decide how to move the study forward without Kentucky’s participation.

2015 – The Federal Study’s Findings: The 66 Corridor Study’s Purpose and Need found a “significant need” to improve access between Paducah and Cape Girardeau. That finding, together with the route in federal law, set the study’s logical termini in January 2015: I-24 at Paducah, crossing into Illinois, and I-55 at Cape Girardeau, by way of the Illinois 146 bridge.

Is the I-66 Corridor 50 miles wide?

No. The 1989 proposal described “the initial 50 mile wide corridor”: the band of land planners would study to find the best route. It was never the width of a highway.

Before any right-of-way is acquired, federal law requires a full environmental review under the National Environmental Policy Act. That review evaluates farmland, homes, wetlands, floodplains, historic sites and endangered species. Farmland was on the 1989 proposal’s review list from the start.

Didn't a 1994 federal study find the corridor unfeasible?

Under its base assumptions, yes. The study, prepared by Wilbur Smith Associates for 12 states and FHWA, used a 7 percent discount rate. At that rate, a conventional Interstate scored a benefit/cost ratio of 0.68, and the best option, a single “Super Highway,” scored 0.94. Both fall short of the 1.0 needed for feasibility. The study also tested a 4 percent discount rate, and at that rate every highway option was economically feasible.

The study also said its findings “do not mean that individual segments of the corridor would not be desirable from a state or regional perspective.” That finding led Kentucky to begin its own I-66 studies. Kentucky’s 1997 Southern Kentucky Corridor (I-66) study found benefit/cost ratios above 1.0 for 70 mph Interstate options at a 4 percent discount rate.

The 1994 numbers rest on 1990 conditions. Since then, populations along the original route concept have grown substantially, in places such as Las Vegas and St. George, Utah. A new analysis would reflect that growth and could reach a different result.

Has the Cape Girardeau area's MPO (SEMPO) ever looked at the corridor?

Yes. SEMPO’s draft 2050 Metropolitan Transportation Plan (March 2026) includes:

  • A section on “the East-West Transamerica Corridor, often called I-66,” noting it “could bring it through the SEMPO region at Cape Girardeau” (pp. 66–67)
  • A goal to “explore opportunities of the Transamerica Corridor through a future MoDOT PEL Study if/when funding becomes available”
  • The corridor on SEMPO’s Illustrative Projects list (Table 55)

The same list includes MoDOT’s $3 million PEL study for a new road from Cape Girardeau toward Van Buren. That’s the corridor’s southeast Missouri segment, listed under a different name. In 2025, TransAmerica Corridor, Inc. worked with SEMO REDI to help advance it to a Tier 1 priority on MoDOT’s Unfunded Needs list.

The plan was written as TransAmerica Corridor, Inc. was being reestablished. Work is under way to list the segment under its corridor name.

What is I-50 (or I-56)?

TransAmerica Corridor, Inc.’s use of “I-50” applies only to the corridor’s eastern segment, from Williamson, West Virginia, through Welch, Beckley and Roanoke to Hampton Roads. TAC reviewed several possible numbers for this part of the statutory route. I-50 is the number we promote, and I-56 remains an option. The final number will be assigned through AASHTO and FHWA at the request of the states. Using a separate number there means the existing I-66 in Virginia keeps its number.

Under TAC’s proposal, I-66 would extend west from its current end at I-81 by way of an upgraded Corridor H to I-79, then down I-79 to Charleston and along an upgraded U.S. 119 to Williamson. From there it continues across eastern Kentucky and westward. The two work together, and neither replaces the other. Our I-50 is not related to other proposals that use the same number.

Is the Somerset Northern Bypass I-66 or I-365?

Both. I-365 (High Priority Corridor 97) and I-66 share a common corridor along the Cumberland Expressway (formerly the Cumberland Parkway), and the Somerset Northern Bypass ties them to the rest of the I-66 Southern Kentucky Corridor. The record, starting with federal law:

Federal law: Congress’s route for the East-West TransAmerica Corridor (High Priority Corridor 3, ISTEA §1105(c)(3), as amended) runs through a Kentucky Corridor “centered on the cities of Pikeville, Jenkins, Hazard, London, and Somerset; then, generally following the Louie B. Nunn Parkway corridor from Somerset to Columbia, to Glasgow, to I–65; then to Bowling Green, Hopkinsville, Benton, and Paducah.” FHWA lists this corridor as I-66. Congress later made the Louie B. Nunn Cumberland Expressway, from I-65 to US 27 in Somerset, its own High Priority Corridor (No. 97) and designated it I-365. Two High Priority Corridors, one road.

Kentucky’s official highway plans: Both of Kentucky’s current programming documents list the project as Somerset Northern Bypass (I-66):

  • 2026–2032 Enacted Highway Plan: Item 8-59.70, “Somerset Northern Bypass (I-66),” from west of the bridge over US-27 to the KY 461/KY 80 interchange.
  • FY 2025–2028 Kentucky Statewide Transportation Improvement Program (STIP): Item 8-59.6, “Somerset Northern Bypass (I-66) Section 4,” from east of the KY 39 interchange to the KY 461/KY 80 interchange.

The I-66 label follows the project’s lineage. KYTC’s 2000 Southern Kentucky Corridor (I-66) Planning Study made the bypass its first priority, the bypass sections have been in Kentucky’s highway plans since 2004, and the 2026 plan added Item 8-59.70, “Somerset Northern Bypass (I-66),” with $54.95 million for construction in FY 2026. KYTC’s 2024 design solicitation describes the bypass as the connection between I-65 and the Cumberland Parkway to the west and the new KY-80/Hal Rogers Parkway/KY-461 interchange and I-75 to the east. KY 80 becomes the Hal Rogers Parkway at London and continues to Hazard.

KYTC’s I-66 planning study: KYTC’s 2000 Southern Kentucky Corridor (I-66) Planning Study named the Somerset Northern Bypass, from the Cumberland Parkway to KY 80, as Priority 1 for the I-66 project.

Rep. Hal Rogers: In an August 28, 2026 letter to TransAmerica Corridor, Inc., Rep. Rogers wrote that he has worked on projects “that would pave the way for the future I-66 in Kentucky,” and that the Northern Bypass “would build a primary connection (I-365) for the future interstate in southern Kentucky, ultimately linking I-65 to I-75.” His press release announcing the bypass grant says it “will help lay the foundation for an East-West highway system connecting communities from I-65 to I-75, opening the door to new opportunities from Paducah, through Pulaski County, all the way to Pikeville.”

The east-west system Rep. Rogers describes is larger than I-365. I-365 runs only from I-65 to Somerset. Paducah lies west of I-65 and Pikeville lies east of Somerset. Both are on the I-66 route in federal law.

Is it unusual for the corridor to share a road with another High Priority Corridor?

No. Congress wrote shared corridors into the East-West TransAmerica Corridor’s own route. In West Virginia, the statute runs the corridor from “Beckley to Welch as part of the Coalfields Expressway,” then “to Williamson sharing a common corridor with the I-73/74 Corridor” (High Priority Corridor 5, the King Coal Highway in West Virginia). In Kentucky, the corridor shares the Cumberland Expressway with I-365 (High Priority Corridor 97). In each case, one designation does not replace or cancel the other.

If Congress authorized the corridor, why isn’t it built? Didn’t some states decide against it?

Congress authorizes corridors, but it does not build them, and it cannot force a state to build one. Each state’s department of transportation, working with its regional Metropolitan Planning Organizations (MPOs), sets that state’s priorities and decides which projects go into its plans. Federal law says the availability of federal highway funds “shall in no way infringe on the sovereign rights of the States to determine which projects shall be federally financed” (23 U.S.C. §145(a)).

When a state sets a segment aside, the corridor stays in federal law until Congress changes it. It waits for state and regional priorities to change. That is why TransAmerica Corridor, Inc. works with MPOs, state DOTs, governors and members of Congress together.

Was I-66 in Kentucky cancelled in 2018?

No. In 2018 the Federal Highway Administration (FHWA) withdrew two environmental documents from earlier studies:

  • June 21, 2018: FHWA rescinded the 2003 Record of Decision and Final Environmental Impact Statement for an I-66 segment between eastern Pike County, Kentucky and western Mingo County, West Virginia.
  • July 2, 2018 (issued June 25): FHWA rescinded the 2002 Notice of Intent to prepare an EIS for a new-terrain I-66 segment between the Somerset Northern Bypass and London, Kentucky.

These notices closed out specific environmental studies. They did not change the corridor Congress authorized in the Intermodal Surface Transportation Efficiency Act (ISTEA) §1105(c)(3), as amended. Only Congress can change that law. KYTC has continued to program the Somerset Northern Bypass as I-66 in its current Six-Year Highway Plan. Any future federal action in the other areas will go through a new environmental review, as federal law requires.

Who secured the funding for the Somerset Northern Bypass?

Rep. Hal Rogers secured the funding, working with the Kentucky Transportation Cabinet. He announced the $85.1 million INFRA grant on September 29, 2026. His August 2026 letter also cites two Community Project Funding requests totaling $82 million. TransAmerica Corridor, Inc. did not secure this funding and does not claim credit for it. We support the project as a key piece of the corridor.

Does Rep. Hal Rogers support I-66?

Yes, in writing. His August 28, 2026 letter supports “ongoing efforts to complete and extend the congressionally authorized East-West TransAmerica Corridor” and calls I-66 one of the “monumental transportation projects” that are “the seeds we plant for a brighter future in America.” His bypass press release describes the project as laying “the foundation for an East-West highway system” from Paducah through Pulaski County to Pikeville, a route that reaches well beyond I-365 at both ends. The full letter is posted on our website.

What is the TransAmerica Transportation Corridor?

The TransAmerica Transportation Corridor was first conceived out of aspirations by Cape Girardeau and southeast Missouri natives in 1987, becoming listed as a High Priority Corridor by the ISTEA Act of 1991. The High Priority Corridor list was created as the national strategy for adding new interstates to the National Interstate Highway System after its formal completion in 1992.

What is the timeline?

There is no formal timeline for constructing the TransAmerica Corridor or Future I-66. Initially conceptualized in the late 1980s, it was put on hold in 2015. Current efforts (as of 2025) are rooted in advocacy and early feasibility work, with no confirmed dates or phases for design, funding, or construction.

What is the purpose and need of the project?

The TransAmerica Transportation Corridor is all about allowing America to transport goods and people quickly along a single east-west corridor. This project will allow for the American economy to compete more effectively in the 21st century, with the Pacific markets of India and China entering our economy on the west coast, and the European Union and EEA entering our economy on the east coast. It will create an interstate spine linking I-70 and I-40 together into an interstate beltway across the continent. Locally, it will be effective in growing the rural communities along the corridor. For example, it will allow small farmers to commute to good paying jobs in our region with a minimum of time and effort

What is the expected cost of the project?

This has yet to be determined. Updating the 1994 TTC study will help identify the cost.

Isn't this just a waste of money?

No. Much of the infrastructure for the TTC already exists from Paducah, KY to Washington, DC and Norfolk, VA as divided four-lane rural expressways with partial access control. Improved highways reduce wear on farm trucks, emergency response times, and fuel costs—all savings for taxpayers and rural families. An interstate spine will allow the 21st century American economy to take full advantage of its location in between the massive economies of Southeast Asia and the European Union.

Will this destroy farmland, forests, or hunting grounds?

No. Highways and interstates today use environmental impact statements (EIS) and public input to reduce impact (largely directed by state departments of transportation). We intend to use the model pioneered by Cananda on their Trans-Canadian Highway, which utilized wildlife crossings to preserve animal life. Their studies have shown a 96% reduction in large animal deaths, such as deer and elk with the use of these new crossings. These establish protected fencing leading to the wildlife crossings, and use landowner input to preserve hunting and conservation land. Most of the TransAmerica Corridor follows already established highways or divided four-lane rural expressways that exist today, reducing some the need for massive new construction projects to build highways where none exist. There are areas along the route where new tunnels or new divided four-lane highways will need to fill gaps.

Is the Government of the United States of America going to seize my land?

No. Any land needed for a highway or interstate project must follow federal and state law, including fair compensation, public hearings, and property owner negotiations. No one is forced to sell without a legal process. Modern highway planning allows for flexibility. In many cases, the route can be adjusted to avoid homes or sensitive areas.

How wide is the TransAmerica Transportation Corridor?

Most of the interstate will be conventional four lane highways, so this would place it at approximately 300 ft. – 350 ft. wide. Any electrical conduit may be added underground or to the side, as needed, which could possibly take it to approximately 400 ft. in some areas. It should be noted that the original study area size was 300 to 350 miles wide. This is not the same thing as the width of the actual corridor, once built. The study area helped to determine the route and its viability (1994), with the Congressionally approved statutory route language following (1995).

What is a foreign trade zone or economic zone? Is this about giving land to another country or foreign global entity?

Absolutely not. “Foreign trade zones” (FTZs) are U.S.-run incentive zones used to attract American manufacturers and logistics companies. They reduce red tape and import/export fees for companies shipping raw materials in and products out. Kansas City, Memphis, Springfield, and St. Louis all have them. They don’t involve foreign control or ownership. They’re tools to make America more competitive—especially for rural areas trying to attract jobs.

Is this project trying to confiscate or regulate private property?

No. (see above)

Who is behind the TransAmerica Transportation Corridor project?

Local business leaders, economic development organizations, engineers, community groups, and citizens like you.

Could a Foreign Trade Zone (FTZ) be created along the entire length of the corridor?

FTZs are tied to a specific U.S. Customs and Border Protection port of entry, not to a highway. Under current federal rules, a zone’s “service area” must stay within 60 miles or 90 minutes’ driving time of a single port of entry, it can cover a large area (in some parts of the country, an entire county), but it radiates out from that one port, not along a road. A corridor running over a thousand miles through multiple states would pass near many different ports of entry, each with its own separate zone, separate sponsoring organization, and separate state authorization. There is no legal mechanism for one continuous Foreign Trade Zone, or a 50-mile band, to run the length of an interstate corridor.

Even within an approved service area, individual sites still have to be separately designated and used for a specific purpose, a service area is not automatically a zone in its entirety.

A corridor-length, 50-mile-wide FTZ isn’t something TransAmerica Corridor, Inc. is choosing to pursue, and it isn’t something the law allows.

Is the TransAmerica Corridor organization attempting to bring data centers along the corridor?

No. While the TransAmerica Corridor organization supports the transportation modes of Conventional Interstate and Electric Conduit, these are for the purpose of establishing the major coast-to-coast transportation route and aiding the connection across America’s electric grids, not for the establishment of a link of data centers. No such plan exists.

Is the TransAmerica Corridor attempting to establish multi-state water pipelines?

No. While water pipelines were foreseen in the multi-modal TTC feasibility study, these pipelines are not an active priority of the TAC organization.

Is the TransAmerica Corridor building a multi-modal facility?

The only transportation modes under consideration are Conventional Interstate and Electric Conduit. The idea of a multi-modal corridor is called a “super-corridor,” and no such example facility exists. The original TTC Feasibility Study (TransAmerica Transportation Corridor) envisioned this concept. It was shown to not be viable at the time. Another example of this concept was the Trans-Texas Corridor (2001-2010), but it was cancelled by the FHWA (it was a state-led concept and never added to the High Priority Corridors List).

Is it true that the East-West TransAmerica Corridor [I-66] is cancelled by the federal government?

No. It would take an Act of Congress to cancel any of the High Priority Corridors, strike any of them from the list, or alter them in any way. Nothing of the kind has happened (there have been amendments). Several EIS cancellations did happen, with at least one ROD recision, but in all cases these occurred primarily due to lack of funding.

Why isn't the East-West TransAmerica Corridor finished yet?

The primary issue is funding. The other issue is that while the original organization behind the corridor (Interstate 66 Project, Inc.) developed an impressive coast to coast coalition, led by the efforts of Walt Wildman, this wasn’t maintained and slowly dissolved. Today the Interstate 66 Project, Inc. is branded as TransAmerica Corridor, Inc. Several other High Priority Corridors have developed coalitions over the years, such as Ports to Plains. With the TransAmerica Corridor organization now added to the CAFI Coalition, future federal funding could happen more easily with the Build America 250 Act. The TransAmerica Corridor is making progress on rebuilding its national coalition.

Is the American High Priority Corridor List influenced by international organizations?

No. The High Priority Corridor List and its designated Future Interstate Corridors (and the Auxiliary Future Interstate List) are designed and controlled by the Congress of the United States of America.

Is it true that the TransAmerica Corridor originated in Cape Girardeau, Missouri?

Yes. It began partially by a plant manager at a local factory near Cape Girardeau with business leaders following the cause by 1987. It became a major initiative of the Regional Commerce and Growth Association (RCGA), until a national scale meeting was convened in St. Louis, Missouri in 1989 that started the Interstate 66 Project, Inc. organization, which was noted in the TransAmerica Transportation Corridor study in 1994. The group moved its headquarters to Wichita, Kansas for a few years, but the organization moved back to Cape Girardeau around 1995. The idea was promoted primarily by Congressman Bill Emerson (though several others joined him, notably Congressman Hal Rogers) from the late 1980s until he died in 1996. The Interstate 66 Project, Inc. organization was superseded by the TransAmerica Corridor, Inc. organization in 2010.

Why does the map show a line continuing west from Kansas to California, if that part of the route isn't authorized by Congress?

The authorized corridor (the part Congress has designated in law) currently ends in Kansas, just west of Wichita. The line shown continuing west from there, through to California, represents TransAmerica Corridor, Inc.’s advocacy proposal: the western extension we are asking Congress to add, not a route that has already been designated.

That proposed line is not arbitrary. It generally follows existing state highways and four-lane divided highways already on the ground, the same way the authorized eastern portion of the corridor was built around existing roads and infrastructure wherever possible. Showing the full coast-to-coast line is how TransAmerica Corridor, Inc. communicates the complete vision we’re advocating for (a true coast-to-coast freight corridor reaching San Diego) without breaking up the map into segments that obscure that goal.

Most of TransAmerica Corridor, Inc.’s maps show this full route as a single continuous line, for visual clarity rather than legal precision. The distinction between what Congress has already authorized (Norfolk, VA to just west of Wichita, KS) and what TransAmerica Corridor, Inc. is proposing to add (Kansas to California) is detailed in writing here, and is also shown visually on the CAFI Coalition’s corridor map, which TransAmerica Corridor, Inc. is a member of. Neither map represents a finished alignment, see the previous question for how alignments are actually determined once a corridor is authorized.

Why do TransAmerica Corridor, Inc.'s maps show a specific line if no alignment has been determined?

The maps on this site illustrate the federally authorized corridor (the general route Congress designated from Norfolk, Virginia to just west of Wichita, Kansas) not a final highway alignment. Our maps follow that authorized route closely, because that’s what they’re meant to show: where Congress has already directed this corridor to go in broad terms.

That authorization is not the same thing as a finished design. The actual alignment (the specific path the highway will follow on the ground) is determined later, by each state’s Department of Transportation, working within the logical termini and other requirements set by the Federal Highway Administration, including full environmental review under the National Environmental Policy Act (NEPA). That process involves detailed engineering, environmental study, and public input.

The maps show where Congress said this corridor should generally go. They do not show, and cannot show, where the road will ultimately be built. That determination is years away and rests with the state DOTs and FHWA, not with TransAmerica Corridor, Inc.

Is TransAmerica Corridor, Inc. planning a 50-mile-wide highway corridor, or a Foreign Trade Zone?

No. TransAmerica Corridor, Inc.’s current mission and legislative work are focused entirely on completing and extending the East-West TransAmerica Corridor that Congress authorized in 1991.

A typical interstate right-of-way is a few hundred feet wide, the same as any other interstate in the country. The “50-mile” figure sometimes referenced online comes from a broad study area used in early-stage planning for data collection and environmental screening, not a proposed width for the road itself. A study area is where analysis happens, not where pavement goes.

No land acquisition is happening, or imminent, anywhere along the corridor. Right-of-way is only acquired after a specific alignment is selected, which only happens after years of environmental review (NEPA) and detailed engineering, work that has not yet begun. At this stage, TransAmerica Corridor, Inc.’s role is advocacy for funding and federal designation, not land selection.

In TransAmerica Corridor, Inc.’s early years, a Foreign Trade Zone was mentioned on an earlier version of our website as one possibility among many long-term ideas for the nation. It was never adopted, never pursued, and is not part of TransAmerica Corridor, Inc.’s mission or board-approved plan. As TransAmerica Corridor, Inc.’s focus sharpened, our work narrowed to what it is today: advocating for completion of the federally authorized highway corridor and the funding that comes with it.

What parts of the East-West TransAmerica Corridor are under construction?

The Somerset Northern Bypass is labeled as I-66 in the Kentucky Highway Plan 2026-2032, with the funding provided by Congressman Hal Rogers, who has been a long-time supporter of the I-66 Corridor.

West Virginia has several miles of the Coalfields Expressway under construction in 2026, just north of Welch.

The King Coal Highway (Future I-73) is under construction in several parts of southern West Virginia. Under the statutory route described by Congress, the East-West TransAmerica Corridor “shares a common corridor” with the I-73 statutory route from Welch to Williamson.

What modes of transportation does the TransAmerica Corridor, Inc. organization support today?

There were multiple modes of transportation studied in the TransAmerica Transportation Corridor Feasibility Study in 1994. Today, the TransAmerica Corridor, Inc. organization supports Conventional Interstate and Electric Conduit. None of the other modes are under active consideration, nor has there been any further analysis on them since the 1994 TTC Feasibility Study.